Rules Change: Outpost Cost Change
Open in chat • 1 post (analysis)
• Page 1 of 1
The rules regarding outposts have changed as discussed in Proposal: Outpost Cost Change.
The following changes were made:
Please post any retroactive changes related to this rules change in this topic.
The following changes were made:
- Outpost construction costs have increased to:
- Outpost Base: 10000
+ 800 
- Upgrade 1: 8000
+ 600 
- Upgrade 2: 6000
+ 400 
- Outpost Base: 10000
- Prefabrication has been deprecated and will be replaced in the future
- Network Centric Colonization has been deprecated and will be replaced in the future
Please post any retroactive changes related to this rules change in this topic.
1 post (analysis)
• Page 1 of 1
