You are here: Wiki » User Namespace » Brend » Attachments » Quote: Surface Heating of Luag

Quote: Surface Heating of Luag

Project Information

moon1.jpeg

Subject
Name Luag
Type Large Moon (7 zones), Goldilocks
Factors No environmental factors
Project Components
Component Initiation Research Required Modules
Surface Heating 750 525
+High Pressure 250 175
+Toxic Gasses 250 175
+Volcanic 250 175
Total 1.500 1050
Licensed Technologies
License Technology Fee
UE-NT-ED Surface Heating 1000
UE-NT-ED Atmospheric Conditioning 300
UE-NT-ED Planetary Geoengineering 300
Total 1600
  • The price of will be set at: 5 per .
  • The total cost of required is 5.250 .
Total Costs
Description Cost
Initiation Research 1.500
Required Modules 5.250
Licensing Fees 1.600
Total 8.350

Project Timetable

Payment Goods
Turns Initial
Research
Licensing Modules Modules Notes
37
38 750
39 300 450 90 (Surface Heating: Luag)
40 300 450 90
41 300 450 90
42 300 450 90
43 300 500 100
44 749 100 325 65
45 1 525 105 (Climate: Luag +High Pressure)
46 525 105
47 525 105 (Climate: Luag +Toxic Gasses)
48 525 105
49 525 105 (Climate: Luag +Vulcanic)
50
51
1500 1600 5250 1050
  • The initial research can be payed at any time, as long as the full payment has been transfered on the indicated turn.
 
user/brend/attachments/t332-1.txt · Last modified: 2012/07/20 21:35 by Brend
|
Recent changes RSS feed Powered by PHP Valid XHTML 1.0 Valid CSS Driven by DokuWiki